The Autocor incorporates tried-and- tested Putzmeister components, such as a placing boom with 92 (28 m)’ reach and a double piston concrete pump and can be assembled according to the specific needs.There are two different concrete pump models available with 144 yd³/hr (110 m³/hr) (28-4.11 H alternatively 210 yd³/hr (160 m³/hr) (28-4.16 H). These components are integrated via an intelligent control system into the manufacturing process of the pre-fab works. This allows the concreting time to be reduced to about a third of the time required using a crane bucket.
Features
- Continuously placing of concrete
- For large precast elements